- Deploy T - blocks made, need to assemble quilt top
- 2012 FQS Designer Mystery BOM - 1/2 the blocks made
- HST BOM - needs border added, backing made, quilting and binding
- Terrain Swoon - needs backing, quilting and binding
- Christmas Quilt -
needs backing, quilting, and binding;backing made - Our Quilt - 1/2 the top is assembled, all blocks are made
- Coming Home Ruby - needs backing, quilting and binding
- Sisters Ten - only 4 blocks made
- FWQAL - need to figure out what I'm going to do with this one
- Marcelle Medallion - 3 borders attached
- Tumbler (forgot about this one!) - need to assemble top
- Scrappy Sprouts - 2 blocks made
- the skull -
needs backing, quilting and binding;backing made and basted; quilting in progress - Hexies (forgot about this one also!) - needs lots of hexies
- Lucky Jam - 7 of 9 blocks complete
- Xplus - need more blocks
- Christmas in St. Louis -
need backing, quilting and binding; backing made - Simply Herringbone -
need to finish panels and assemble;backing made, basted, quilting in progress; quilting complete
Pages
▼
Friday, December 13, 2013
Challenge update
Each Friday for the month of December I plan on updating the status of my personal challenge that I first blogged about over here. Any changes to the status of an item on this list are in red:
Progress is progress. I sometimes wonder if we ever feel like we make enough progress when we are really trying to get things done.
ReplyDelete